How to get cost-effective legal advice
Professional advice, of any kind, is never cheap. But there are number of things you can do to make sure the cost of your legal support doesn't outweigh the benefits you receive from it.
Read MoreAn employee who acquires an interest under an employee share scheme will generally be required to pay tax. However the time at which this tax is payable, and also the way in which the tax is ...
Since July 2015, the Australian Government has been allowing concessions to eligible companies in an effort to improve the competitiveness of Australia’s tax treatment of employee share schemes. This ...
AS 4902, more formally known as AS 4902-2000 General Conditions of Contract for Design and Construct, is one of the most widely used forms of head contract for design and construct projects in ...
A construction management contract is one type of Early Contractor Involvement (or ‘ECI’) arrangement, and differs from a traditional lump sum model in a number of respects. This article explains the ...
This article explains the different types of construction contract, and explains how to choose the right type of contract for your next project. Although the same general principles should apply to ...
A provisional sum is an allowance included in a fixed price construction contract for an item of work that cannot be priced by the contractor at the time of entering the contract.
Both AS 2124 and its successor AS 4000 are widely used forms of construction contract in Australia. Although they have many similarities, there are some significant differences.
The Australian Standard AS 2124-1992 General Conditions of Contract remains a widely used form of construct only head contract, despite it having been succeeded by AS 4000-1997 and now being almost ...
The defects liability period (or 'DLP') is a fixed period of time, starting from the date of practical completion, during which the contractor has an express contractual right to return to the site ...
Construction contracts usually contain specific procedures for claiming a variation - which, if not followed, can result in your entitlement to claim being lost. There are six basic steps to follow ...
AS 4000, more formally known as the Australian Standard AS 4000-1997 General Conditions of Contract, is one of the most widely used forms of head contract for construction projects in Australia.
Early contractor involvement (or 'ECI') is a method of construction contracting that allows a builder to become involved, and potentially start work, before the design has been completed.
Professional advice, of any kind, is never cheap. But there are number of things you can do to make sure the cost of your legal support doesn't outweigh the benefits you receive from it.
Read MoreThis article explains practical completion under AS 4902 – what it is and the notice requirements for claiming.
Read MoreThis article explains how to make a claim for a latent condition under AS 4902. It includes a flowchart to explain the process.
Read MoreThis article explains how to claim an extension of time (EOT) under AS 4902. It includes a flowchart and forms to explain the process.
Read MoreIn a construction context, a deed of collateral warranty is a deed signed by a subcontractor that contains warranties and other obligations in favour of the ultimate principal on the project.
Read MoreA qualifying cause of delay under AS 4902 is a delay for which the contractor can claim an EOT. The specific qualifying causes of delay are explained in more detail below.
Read MoreNo sales pitches, no spam, and one-click unsubscribe.
Level 22, Sydney Place, 180 George Street, Sydney NSW 2000
P: +61 2 9229 2922 | E: info@turtons.com
Liability limited by a scheme approved under Professional Standards Legislation.