<img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=1556145&amp;fmt=gif">

Browse or search our extensive collection of articles below.

    When do employees pay tax on employee share scheme interests?

    An employee who acquires an interest under an employee share scheme will generally be required to pay tax. However the time at which this tax is payable, and also the way in which the tax is ...

    read more

    Eligibility criteria for the ESS start-up concession

    Since July 2015, the Australian Government has been allowing concessions to eligible companies in an effort to improve the competitiveness of Australia’s tax treatment of employee share schemes. This ...

    read more

    Introduction to AS 4902

    AS 4902, more formally known as AS 4902-2000 General Conditions of Contract for Design and Construct, is one of the most widely used forms of head contract for design and construct projects in ...

    read more

    What is a construction management contract?

    A construction management contract is one type of Early Contractor Involvement (or ‘ECI’) arrangement, and differs from a traditional lump sum model in a number of respects. This article explains the ...

    read more

    The different types of construction contract explained

    This article explains the different types of construction contract, and explains how to choose the right type of contract for your next project. Although the same general principles should apply to ...

    read more

    What is a provisional sum?

    A provisional sum is an allowance included in a fixed price construction contract for an item of work that cannot be priced by the contractor at the time of entering the contract.

    read more

    10 differences between AS 4000 and AS 2124

    Both AS 2124 and its successor AS 4000 are widely used forms of construction contract in Australia. Although they have many similarities, there are some significant differences.

    read more

    Introduction to AS 2124

    The Australian Standard AS 2124-1992 General Conditions of Contract remains a widely used form of construct only head contract, despite it having been succeeded by AS 4000-1997 and now being almost ...

    read more

    What is the defects liability period (DLP)?

    The defects liability period (or 'DLP') is a fixed period of time, starting from the date of practical completion, during which the contractor has an express contractual right to return to the site ...

    read more

    How to claim a variation under a construction contract

    Construction contracts usually contain specific procedures for claiming a variation - which, if not followed, can result in your entitlement to claim being lost. There are six basic steps to follow ...

    read more

    Introduction to AS 4000

    AS 4000, more formally known as the Australian Standard AS 4000-1997 General Conditions of Contract, is one of the most widely used forms of head contract for construction projects in Australia.

    read more

    What is Early Contractor Involvement (ECI) and how does it work?

    Early contractor involvement (or 'ECI') is a method of construction contracting that allows a builder to become involved, and potentially start work, before the design has been completed.

    read more

    Posts by Greg Henry | Principal :

    How to get cost-effective legal advice

    Professional advice, of any kind, is never cheap. But there are number of things you can do to make sure the cost of your legal support doesn't outweigh the benefits you receive from it.

    Read More

    Practical completion under AS 4902

    This article explains practical completion under AS 4902 – what it is and the notice requirements for claiming.

    Read More

    How to claim for a latent condition under AS 4902

    This article explains how to make a claim for a latent condition under AS 4902. It includes a flowchart to explain the process.

    Read More

    How to claim an EOT under AS 4902

    This article explains how to claim an extension of time (EOT) under AS 4902. It includes a flowchart and forms to explain the process.

    Read More

    What is a Deed of Collateral Warranty?

    In a construction context, a deed of collateral warranty is a deed signed by a subcontractor that contains warranties and other obligations in favour of the ultimate principal on the project.

    Read More

    What is a qualifying cause of delay under AS 4902?

    A qualifying cause of delay under AS 4902 is a delay for which the contractor can claim an EOT. The specific qualifying causes of delay are explained in more detail below.

    Read More