<img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=1556145&amp;fmt=gif">

Browse or search our extensive collection of articles below.

    When do employees pay tax on employee share scheme interests?

    An employee who acquires an interest under an employee share scheme will generally be required to pay tax. However the time at which this tax is payable, and also the way in which the tax is ...

    read more

    Eligibility criteria for the ESS start-up concession

    Since July 2015, the Australian Government has been allowing concessions to eligible companies in an effort to improve the competitiveness of Australia’s tax treatment of employee share schemes. This ...

    read more

    Introduction to AS 4902

    AS 4902, more formally known as AS 4902-2000 General Conditions of Contract for Design and Construct, is one of the most widely used forms of head contract for design and construct projects in ...

    read more

    What is a construction management contract?

    A construction management contract is one type of Early Contractor Involvement (or ‘ECI’) arrangement, and differs from a traditional lump sum model in a number of respects. This article explains the ...

    read more

    The different types of construction contract explained

    This article explains the different types of construction contract, and explains how to choose the right type of contract for your next project. Although the same general principles should apply to ...

    read more

    What is a provisional sum?

    A provisional sum is an allowance included in a fixed price construction contract for an item of work that cannot be priced by the contractor at the time of entering the contract.

    read more

    10 differences between AS 4000 and AS 2124

    Both AS 2124 and its successor AS 4000 are widely used forms of construction contract in Australia. Although they have many similarities, there are some significant differences.

    read more

    Introduction to AS 2124

    The Australian Standard AS 2124-1992 General Conditions of Contract remains a widely used form of construct only head contract, despite it having been succeeded by AS 4000-1997 and now being almost ...

    read more

    What is the defects liability period (DLP)?

    The defects liability period (or 'DLP') is a fixed period of time, starting from the date of practical completion, during which the contractor has an express contractual right to return to the site ...

    read more

    How to claim a variation under a construction contract

    Construction contracts usually contain specific procedures for claiming a variation - which, if not followed, can result in your entitlement to claim being lost. There are six basic steps to follow ...

    read more

    Introduction to AS 4000

    AS 4000, more formally known as the Australian Standard AS 4000-1997 General Conditions of Contract, is one of the most widely used forms of head contract for construction projects in Australia.

    read more

    What is Early Contractor Involvement (ECI) and how does it work?

    Early contractor involvement (or 'ECI') is a method of construction contracting that allows a builder to become involved, and potentially start work, before the design has been completed.

    read more

    Posts by Greg Henry | Principal :

    How to claim a variation under AS 4902

    This article explains how to claim a variation under AS 4902. It includes a flowchart to explain the process.

    Read More

    What is a "global claim" under a construction contract?

    A global claim is where a contractor makes a claim for a single amount of money by reference to multiple underlying causes or events. They typically arise in the context of delays where there are mult...

    Read More

    Common amendments to AS 4902

    Most informed principals consider AS 4902 to be too heavily weighted in favour of the contractor. Consequently, it is fairly normal to see AS 4902 issued with amendments or special conditions. This ar...

    Read More

    Introduction to AS 4902

    AS 4902, more formally known as AS 4902-2000 General Conditions of Contract for Design and Construct, is one of the most widely used forms of head contract for design and construct projects in Austral...

    Read More

    Should you engage a construction lawyer?

    The fact that you're reading this suggests that the answer could be yes. But before making a decision either way, there are a number of factors you need to consider, including cost.

    Read More

    Are you asking the right question?

    When people come to us for advice, or even just visit our website, it's because they have a specific problem to solve. And a lot of the time, after we start speaking to them, it becomes apparent that ...

    Read More
    Resources
    Careers